Christ Our King Presbyterian Church Cistern

 

Project Location: Bel Air, MD

Problem: This 50-year old church and school was plagued by periodic flooding due to high volumes of runoff from the roof and impermeable parking lot.  A small retention pond on site was failing during big rains, causing neighboring residential areas to flood. 

Contact Information
Adrienne Shevchuk | ashevchuk@cbf.org | 410-268-8816
before image
after image
Subscribe to Harford