Berlin, MD
In the summer of 2011, the Environmental Finance Center began working with the Town of Berlin, MD – an Eastern Shore community with a population of approximately 4,000 – to complete a stormwater financing feasibility study. Along with an analysis of current and emerging funding needs and an assessment of possible revenue that could be collected by the formation of a stormwater utility, the EFC conducted community outreach that included a Stormwater Photo Contest.