Raining Classrooms at the Claud E. Kitchens Outdoor School

 

Project location: Clear Spring, MD

Problem:  Water runoff from storm events collected in pools on the road and driveway in front of the Claud E. Kitchens Outdoor School, causing flooding in the summer and dangerous icy conditions in the winter. A $10,000 under-road culvert was proposed as a solution, but was beyond the school budget. 

Contact Information
Eddie Waldron | Claud E. Kitchens Outdoor School | 301-766-8138
Frank Rodgers | Cacapon Institute | frodgers@cacaponinstitute.org
before image
after image
Subscribe to Washington